Showing posts with label House. Show all posts
Showing posts with label House. Show all posts

Thursday, July 1, 2021

In Full Color!

The yard is showing off right now. 😃

There are Japanese Beetle sightings in the neighborhood.  They haven’t hit our yard.  Yet.






Tuesday, May 25, 2021

Preview: Basement Upgrade

The basement has been going through a pretty major overhaul the past 2 months and she’s almost done!


Monday, May 10, 2021

New Tile in the Laundry Room

We’re on vacation this week.  Staycationing and getting stuff done around the house.

Chris is making cuts, Erica is laying the tile (she’s never tiled before!)



New Tile & Utility Sink


And with grout.

Thursday, April 1, 2021

10 years

This week marks our 10 year house Anniversary.  We currently have some house things cooking that we’ll share here on the blog soon.

In the meantime, check out these young kids:



Sunday, December 20, 2020

A Little Christmas



Sunday, July 28, 2019

Trim is in!



Saturday, July 13, 2019

Friday, July 12, 2019

Kitchen: Nearing the End

Finish electrical was wrapped up this week.  Next up: cabinet hardware, happening this weekend.



Monday, July 1, 2019

Tile Sneak Peek

Friday, June 28, 2019

The Butlers Pantry (f/k/a The Wine Room)



There will be an outlet in each garage for our countertop appliances.

Sunday, June 16, 2019

Modifying Cabinets for the Sink

Countertops are scheduled to go in Tuesday morning!


Tuesday, May 28, 2019

Cabinets!

The cabinets are not trimmed out yet - they didn’t measure for the crown correctly.  We had custom paint on the uppers, so a couple week lead time at least for the crew to come back out with the crown in the right color.  We also need the countertops in before the uppers in the wine room (now called the butlers pantry) can go in due to the appliance garages that sit at counter level.  It’s all a big game of timing.  

We are toying with the idea of not installing hardware on the doors.  All of the doors have finger pulls.


Close up of the Walnut.  It is so pretty.

Saturday, May 25, 2019

Backsplash

We met with a designer at Floor and Decor first thing this morning.  Backsplash tile & grout have been picked:  




Friday, May 24, 2019

Cabinets in da House!

Kitchen cabinets were delivered today and will be installed on Tuesday.

Sunday, May 19, 2019

Light & Bright

Ceiling and walls are painted.  Not the greatest pic due to the light and appliances in the way.  We don’t have full power and limited lights in the kitchen right now.  But it gives a decent idea.


Saturday, May 18, 2019

Next Step: Paint

Cabinets will be installed end of this coming week.  We are painting beforehand.

Friday, April 26, 2019

At the Showroom

Before pulling the trigger on our countertop, we went to see a slab in person.  The showroom also served wine and beer so we had a mini happy hour while we were at it.  

Wednesday, April 17, 2019

Shaping Up

Drywall started today.


Wednesday, April 10, 2019

Kitchen Update

The kitchen design has been finalized and cabinets are in production.  Cabinet install expected in about 6 weeks.

Chris & Jim framed out the back kitchen wall a couple weeks ago in prep for the electrical and drywall.

Rough-in electrical should be finished today.



Sunday, February 3, 2019

Demo is Done-zo

We put our granite countertops on a curb alert on Craigslist and a lady took them all.  We threw in the sink.

Habitat for Humanity is coming on Thursday to pick up all of the kitchen cabinets.

Next steps: 1) get our electrician in to add can lighting, fix some wiring, and add some outlets. 2) get the drywall guy in to take a look at the surprise exposed brick and get it ready for tile. 3) put all of our demo debris in our bagster and schedule pick up. 4) finalize kitchen cabinet design.