There are Japanese Beetle sightings in the neighborhood. They haven’t hit our yard. Yet.
Showing posts with label House. Show all posts
Showing posts with label House. Show all posts
Thursday, July 1, 2021
Tuesday, May 25, 2021
Preview: Basement Upgrade
The basement has been going through a pretty major overhaul the past 2 months and she’s almost done!

Monday, May 10, 2021
New Tile in the Laundry Room
We’re on vacation this week. Staycationing and getting stuff done around the house.

New Tile & Utility Sink

Chris is making cuts, Erica is laying the tile (she’s never tiled before!)
New Tile & Utility Sink
And with grout.
Thursday, April 1, 2021
10 years
This week marks our 10 year house Anniversary. We currently have some house things cooking that we’ll share here on the blog soon.

In the meantime, check out these young kids:
Sunday, December 20, 2020
Sunday, July 28, 2019
Saturday, July 13, 2019
Friday, July 12, 2019
Kitchen: Nearing the End
Finish electrical was wrapped up this week. Next up: cabinet hardware, happening this weekend.
Monday, July 1, 2019
Friday, June 28, 2019
The Butlers Pantry (f/k/a The Wine Room)
There will be an outlet in each garage for our countertop appliances.
Sunday, June 16, 2019
Tuesday, May 28, 2019
Cabinets!
The cabinets are not trimmed out yet - they didn’t measure for the crown correctly. We had custom paint on the uppers, so a couple week lead time at least for the crew to come back out with the crown in the right color. We also need the countertops in before the uppers in the wine room (now called the butlers pantry) can go in due to the appliance garages that sit at counter level. It’s all a big game of timing.
We are toying with the idea of not installing hardware on the doors. All of the doors have finger pulls.
Close up of the Walnut. It is so pretty.
Saturday, May 25, 2019
Backsplash
We met with a designer at Floor and Decor first thing this morning. Backsplash tile & grout have been picked:

Friday, May 24, 2019
Sunday, May 19, 2019
Light & Bright
Ceiling and walls are painted. Not the greatest pic due to the light and appliances in the way. We don’t have full power and limited lights in the kitchen right now. But it gives a decent idea.
Saturday, May 18, 2019
Friday, April 26, 2019
At the Showroom
Before pulling the trigger on our countertop, we went to see a slab in person. The showroom also served wine and beer so we had a mini happy hour while we were at it.
Wednesday, April 17, 2019
Wednesday, April 10, 2019
Kitchen Update
The kitchen design has been finalized and cabinets are in production. Cabinet install expected in about 6 weeks.
Chris & Jim framed out the back kitchen wall a couple weeks ago in prep for the electrical and drywall.
Rough-in electrical should be finished today.
Sunday, February 3, 2019
Demo is Done-zo
We put our granite countertops on a curb alert on Craigslist and a lady took them all. We threw in the sink.
Habitat for Humanity is coming on Thursday to pick up all of the kitchen cabinets.
Next steps: 1) get our electrician in to add can lighting, fix some wiring, and add some outlets. 2) get the drywall guy in to take a look at the surprise exposed brick and get it ready for tile. 3) put all of our demo debris in our bagster and schedule pick up. 4) finalize kitchen cabinet design.
Subscribe to:
Posts (Atom)