The stove is up and running.
First, it needed to be properly wired. The old box was outside of the wall and the old stove was hard wired. The wiring was in the middle of a chimney and duct work making it impossible to put the entire box in the wall, but Chris got it in best he could up against a stud.
We were worried about this because the right side of our stove is exposed and we could have had a huge gap between the stove and the wall because of the protruding box. Luckily, everything worked out.
Chris loves the fridge & Erica loves this stove. Double ovens - enough said!